Here it goes before someone throws a fit and starts acting strange.


24th November 2005 - Bought some long pieces for the 4 main legs. This should be a fairly large treb if I'm to keep to the same scale as before. Will make this treb with two different throw arms to get both traction and hcw versions.

30th November 2005 - Got around to chopping them up into tiny bits and pieces finally. The problem I'm facing with this catapult is that it's traditionally a large catapult but it's absent of cross-bracing. The real SiJiao catapults had their legs buried into the ground. I obviously can't do that with my model, and if I just simply cut and joined pieces together it won't last very long so I need to socket joints. Took awhile to get the dimensions right.

1st December 2005 - This is the most tedious part. Spent about a hour cutting and sawing out all the sockets and slots.

2nd December 2005 - Assembly of the two main frames and machining of secondary members.

3rd December 2005 - The frame is almost complete. Will need to start on the throw arm next.

5th December 2005 - Pivot completed.

6th December 2005 - Throw Arm (Traction Version) -7 Bamboo rods tied together

12th December 2005 - Throw Arm (Hinged Counterweight Version) -7 Bamboo rods tied together

13th December 2005 - Counterweight bucket